Saturday, January 23, 2016

Dream Realized

In my last post, I discussed obstacles that we overcame.  Now, I will show you how the wall was built using pictures.

2*4 attached to studs.



Picked up Plywood at local hardware store.



Prepped for painting.



Painted with outdoor green paint mixed with sand for texture.



Drilled approximately 76 holes per sheet with spade.



Plus 17 holes on an additional small piece of plywood. 



Next hammered in t-nuts for bolt on holds.



Then mounted sheets of plywood.


Blank Slate



Stopped to plan out holds.
















Holds Placed



Initial Wall COMPLETE!!! (July 2015)




Improvements since...

Step added under right section. (August 2015)



Climbing routes designed. (October 2015)



Tada!!!



Campus rungs added to right wall. (December 2015)



Transition step mounted. (January 2016)



Latest addition done!




















Final Wall (until the next addition...)